TEST SEQUENCE FOR PROCEDURE 2A k 2A Second Vibration Test Bloc5 Shock testing is now complete. Go to the Second Vibration Test Block. 6 Select a bottom face corner to replace the corner required in Step 4 Sequence 1 to begin the test. 7 Identify the edges of the packaged-product that meet the Step 4 Sequence 2 and 3 requirements. 8 Select any 6 faces to replace the faces required in Step 4 Sequence 5 through 10. 9 Using the corner, edges and faces from Steps 6 through 8 go to Step 3 and proceed. 10 Shock testing is now complete. Go to the Second Vibration Test Block. FIXED DISPLACEMENT Step Action 1 Determine if testing is going to be Fixed Displacement or Random Vibration. IF Vibration testing is going to be … THEN go to … Fixed Displacement Step 2. Random the Random Vibration Test Block. 2 Put the packaged-product on the vibration table so that face 3 rests on the platform. 3 Start the vibration system to vibrate at 1 inch (25 mm) total displacement at the machine’s lowest frequency. 4 Maintain a fixed displacement at 1 inch (25 mm) and slowly increase the frequency (speed) of the vibration table until the packaged-product begins to momentarily leave the surface of the platform. 5 Hold the vibration frequency to that determined in Step 4. 6 Can a metal shim be intermittently moved between the bottom of the longest dimension of the packagedproduct and the surface of the platform? . If Yes, hold that frequency and then continue to next Step. . If No, then increase the frequency until the requirement of Step 6 is met and hold that vibration frequency. 7 Determine the test duration in minutes using the formula indicated in the Before You Begin Block and the CPM or Hz frequency identified in Step 6. 8 Begin vibration duration. 9 Are you using a vertical linear motion on the vibration system? . If Yes, then go to Step 13. . If No, then continue with the next Step. 10 Stop the vibration test half way through the vibration duration and perform the appropriate action as indicated in the table below: IF a single 90o horizontal rotation is… THEN perform a horizontal rotation of … Possible 90o as the specimen rests on the platform. Not practical because of the size of the 180o as the specimen rests on the platform. packaged-product or the stability of the packaged-product. 11 Start the vibration system and continue the vibration test at the frequency used in Step 8. Continued ISTA 2A 2001 - Page 12 of 18 TEST SEQUENCE FOR PROCEDURE 2A 2A 12 Can a metal shim be intermittently moved between the bottom of the longest dimension of the packagedproduct and the surface of the platform? . If Yes, then continue to next Step. . If No, then slowly increase the frequency until the requirement of Step 12 is met. 13 Complete vibration duration. 14 Inspection of the package-product for visible damage is allowed, provided inspection does not alter, in any way, the current condition of the package or the condition or position of the product(s).
2006年08月19日 08点08分
2
level 0
15 All testing is now complete. Go to the Test Report Block. RANDOM Step Action 1 Put the packaged-product on the vibration table so that face 3 rests on the platform. 2 Start the vibration system to produce the random vibration spectrum indicated in the Before You Begin Block. 3 Stop the vibration system after the completion of 30 minutes. Invert the packaged-product so that face 1 (top) rests on the platform. 4 Begin the vibration duration for this orientation. 5 Stop the vibration system after the completion of 10 minutes. Place the packaged-product so that either face 2 or 4 rests on the platform. 6 Begin the vibration duration for this orientation. 7 Stop the vibration system after the completion of 10 minutes. Place the packaged-product so that either face 5 or 6 rests on the platform. 8 Begin the vibration duration for this orientation. 9 Stop the vibration testing at the end of 10 minutes. 10 Inspection of the packaged-product for visible damage is allowed, provided inspection does not alter, in any way, the current condition of the package or the condition or position of the product(s). 11 All testing is now complete. Go to the Test Report Block. ISTA 2A 2001 - Page 13 of 18 TEST REPORT FOR PROCEDURE 2A gin 2A Before You BeReport The packaged-product has satisfactorily passed the test if, upon examination, it meets the Product Damage Tolerance and Package Degradation Allowance. ISTA Certified Testing Laboratories: . Should file a test report on all ISTA Test Procedures or Projects conducted. . Shall file a test report on all ISTA Test Procedures or Projects conducted to obtain Transit Tested Package Certification or Acknowledgement. For additional information, refer to Guidelines for Selecting and Using ISTA Test Projects and Procedures. ISTA Transit Tested Program The ISTA Transit Tested Certification Mark as shown is a: . registered certification mark and . can only be used by license agreement and . by a member of the International Safe Transit Association. When a member prints this certification mark on a packaged-product with their license number they are showing their customer and the carrier that it INTERNATIONAL SAFE TRANSIT ASSOCIATION . TRANSIT TESTED has passed the requirements of ISTA preshipment testing. MANUFACTURER’S LICENSE NUMBER: The manufacturer certifies that this PACKAGED-PRODUCT has passed preshipment testing requirements established by ISTA. In order to maintain its certified status and eligibility for identification with the TRANSIT TESTED Certification Mark, each packaged-product must be re-tested whenever a change is made in the: . Product or . Process or . Package. Changes in the product include changes in: . Design or . Size or . Materials. Changes in the process include changes in: . Manufacturing or . Assembly or . Filling. Changes in the package include changes in: . Configuration or . Dimensions or . Weight or . Materials or . Components. As a quality control procedure, packaged-products should be re-tested frequently, for example, yearly.
2006年08月19日 08点08分
3
level 0
ISTA 2A 2001 - Page 14 of 18 TEST REPORT FOR PROCEDURE 2A The diagram below indicates the steps in ISTA Test Report Processing. gin 2A Before You BeReport Continued t ject. Alllinclfltt tt is lt. lf liofficial TestISTA Certified Laboratory Testies itine. t tt y Test Report y ISTA Headqf ty y y y fiTested Certtt licy. f Ited Shipper Shipper Shipper Shipper At tf the tif ISTA HeadqISTA HeadqISTA HeadqISTA Headqif Shipper IS Shipper IS Failed Conducts an ISTA TesProcedure or Pro sampes tested, uding all replicate tests i conducted, must meet the criteria from the Product Damage Tolerance and Package Degradation Allowance Block to report the test resus as a pass. If any sample fails any of the tess thenhe tesconsidered a faied tesThe resuts othe test (pass or fai) are submitted to ISTA headquarters usng an Report Form. Report forms are available to member laboratorn printed, disk forma or onlISTA examines the report to insure that theest was conducted in accordance withhe tesprocedure and for completeness. Upon acceptance of the report, ISTA processes the report by performing the appropriate action. Test LaboratorTest Laboratoruarters Receives a copy oCertification Letter. Receives a tes report acknowledgement. No correspondence is received. No correspondence is received. Test LaboratorTest LaboratorTest LaboratorTest LaboratorReceives a Certication Letter. May use the ISTA Transit ificaion Mark on the packaged-producaccording to the license agreement and ISTA poReceives a Notification oISTA testing. May not use theSTA Transit TesCertification Mark on the packaged-product. No correspondence is received. No correspondence is received. Certifies the packagedproduct and ISTA retains a copy of the report and Certification Letter on file. cknowledges the packaged-producpassed the tes and ISTA retains a copy oreport and Acknowledgmen Letter on file. ISTA retans a copy othe report on file. uarters uarters uarters uarters ISTA retans a copy othe report on file. an ISTA member Shipper IS NOT an ISTA member an ISTA member Shipper IS NOT an ISTA member Packaged-Product Passed Packaged-Product ISTA 2A 2001 - Page 15 of 18 TEST REPORT FOR PROCEDURE 2A General 2A Requirements The following information is required when completing the Certified Laboratory Test Report: ISTA Certified Testing Laboratory Information . Complete laboratory name and address . Test Laboratory ID number . Test Technician who performed the test . Test Report submitted by: name and signature Product Manufacturer/Shipper Information . Manufacturer/Shipper company name and address . Test requested by (individuals name) . Manufacturer/Shipper ISTA License Number, of applicable and known Third-party Test Request Information . Test conducted for company name and address . Test requested by (individuals name) . Relationship to the product manufacturer/shipper
2006年08月19日 08点08分
4