风妖NIM
风妖NIM
关注数: 0
粉丝数: 0
发帖数: 1,926
关注贴吧数: 2
【100315问问】韩庚有微博么 刚无意间在新浪围脖看见韩庚的微博 就这个 http://tieba.baidu.com/mo/q/checkurl?url=http%3A%2F%2Ft.sina.com.cn%2Fhangeng&urlrefer=af08849c15848422428d406e0cf7f50f 是真的假的?本人么?
【080111求助】关于PS 今天一时兴起下了个PS软件结果刚玩不久杂工具栏就没反应了呢可是其他的都可以用的最小化都可以 可以退出也不行这个 我搞不清楚到底是电脑中毒了呢还是哪里操作的问题啊亲们 谁可以帮帮我
【071003呼唤】英语达人的帮忙 有两段文字现在急需亲们帮忙翻译一下:The LDO burning system for each steam generator unit will consist of filtration and pressurising unit having 2 x 100% capacity pumps with matching suction strainers consisting of 2 x 100% capacity matching pressure filters, air atomised burners, LDO safety and burner shut off valves, LDO pressure control valve, LDO metering units, LDO atomising air headers at burners, atomising air pressure control valves, piping and valving necessary for bypass and isolation, LDO burner header recirculation control valve, recirculation piping with valves upto the LDO tanks as identified in the enclosed sketch. Supplier to provide the detail writeup on LDO operating system during detail engineering for owner’s review and approval. DATE TO BE FURNISHED AFTER AWARDS OF CONTRACT1.7FOR INFORMATIONThe drawing and documents which are not subject to approval will be stamped “FOR INFORMATION” however, the Engineer and Owner will reserve the right to comment on these drawings and documents and inform Contractor to treat these drawings and documents as ‘ FOR APPROVAL” category.急 谢谢了啊!!!!
1
下一页